MetTrack Cal Interval Problems

Started by Hawaii596, 11-05-2009 -- 11:35:14

Previous topic - Next topic

Hawaii596

If we had the funds, we would probably switch applications.  But....  Using MetTrack, there is a problem where with (for a very typical example) in a 12 month interval, the due date shifts by one or more days depending on who knows what.

Many users want due date to be the same as cal date plus one year (for the 12 month interval cals).  That is pretty reasonable, and with other software I've used, it always comes out that way.

Any MetTrack gurus here that know how to fix this issue in MetTrack?  Or is that just how it is with MetTrack, and can't be changed?  And we'll have to continue manually overriding due dates as needed.
"I often say that when you can measure what you are speaking about, and express it in numbers, you know something about it; but when you cannot measure it, when you cannot express it in numbers, your knowledge is of a meagre and unsatisfactory kind."
Lord Kelvin (1824-1907)
from lecture to the Institute of Civil Engineers, 3 May 1883

MRD

I could be mistaken but isn't there also an option for interval based on days.  365 days?

Hawaii596

Figured it out....  It was a strange one.

We have a particularly large customer who has limits on what days of the week the due dates must be (unbeknownst to me until this afternoon).  So there are some of the non-working days boxes checked on the system config, which in turn shuffles due dates ahead or back to stay within those limits.