PMEL Forum

General => General Discussion => Topic started by: Trackerdan on 07-05-2010 -- 15:09:50

Title: Anyone ever work at the McCellan AFB PMEL for Collins Int. Services around 1980?
Post by: Trackerdan on 07-05-2010 -- 15:09:50
Hello,

As a student between 1980-81 I worked at the McCellan AFB PMEL for Collins Int.  Services.  Just wonder whatever happened to the old group and Collins Services themselves.  I think they were a division of Rockwell?

I would get out of school go work another job till about 5:00 and then go work the rest of the swingshift there till about midnight.  Since I was the last man in I always got the oldest equipment and when I pulled the documentation it would have stamped on it something like "Destroy in case of enemy attack".  Most of it looked to be WWII vintage or well worn to say the least.  It brings back fond memories.

Thanks,

TD
Title: Re: Anyone ever work at the McCellan AFB PMEL for Collins Int. Services around 1
Post by: StuG on 07-07-2010 -- 22:17:52
I worked at McClellan from Sept 80 - Sept 98.  Don't remember you.  But CISCO
went through a lot of techs back then.  (Thursday afternoons were scary) Started in meters under John Royer, finally got into mech where I belong, after 3 yrs.  Boss was Slick. 
When BRACK got ahold of McClellan, I came to Vandenberg. 
Title: Re: Anyone ever work at the McCellan AFB PMEL for Collins Int. Services around 1
Post by: StuG on 07-07-2010 -- 22:23:20
P. S.  Is Bills Place still in Wheatland? Best steak sandwich & cold beer in the world!!!! Sit on stool #4